Energy
The energy use in Stockholm Royal Seaport is efficient and follows the principles of the . The primary goal is to reduce energy demand, followed by the use of renewable energy sources. Buildings feature well-insulated climate shells and energy-efficient installations, along with control systems that ensure low energy consumption and high performance.
2025 Highlight:
Key figures
- Measured energy consumption for Norra 2 averages 67 kWh/m², which is 26% lower than the applicable .
- Measured energy consumption for Brofästet averages 64.9 kWh/m², which is 26% lower than the applicable Swedish Building Code Regulations (BBR).
- In the historic buildings of Gasverket, energy consumption has decreased by an average of 57% compared to original energy performance.
Energy-efficient buildings
Energy requirements in Stockholm Royal Seaport have evolved based on insights from ongoing monitoring. Initially, requirements focused on specific energy use with a weighting factor for electric heating. Requirements were later introduced for net energy, that is, the energy supplied. In upcoming land allocations, energy requirements will follow the calculation method using primary energy figures.
The average measured energy consumption is 68 kWh/m² for residential buildings and 54.9 kWh/m² for newly constructed commercial spaces, according to Stockholm Royal Seaport's calculation method.
In the existing historic buildings in Gasverket, energy consumption has been reduced by approximately 57 per cent compared to initial calculations.
In 2024, the total energy consumption for heating, domestic hot water, and property energy amounted to approximately 23.8 GWh. Additionally, household and operational electricity is estimated at approximately 10 GWh. The majority, 83 per cent, of buildings are connected to district heating.
Monitoring has revealed potential for further energy efficiency improvements. Through open dialogue, vital insights have been gained and shared, transferring these experiences to new phases and other projects in Stockholm. A key lesson is that calculated energy use often differs from measured consumption due to deficiencies in quality control during the construction process and in handover and management routines. Dialogue with developers has led to energy consumption being reduced by up to 15 per cent after the buildings are in use.
To test explore the plus-energy building concept, a land allocation competition was held in 2017, won by Stockholmshem, a public housing company. Experiences demonstrate the complexity of implementing this concept on a larger scale. Achieving a fossil-free, optimised energy system requires a holistic perspective at the district level rather than merely at the building level.
Energy-efficient facilities
In public spaces and certain pedestrian and cycle paths, motion-controlled LED lighting automatically adjusts brightness levels, halving energy use and reducing costs.
The energy consumption target for the vacuum waste collection system for and plastic packaging fractions was achieved in 2024. However, the target for newspapers was not met due to low volumes.
In 2024, a total of 1,190 MWh was used for lighting, vacuum waste collection, and electricity for operations at the Construction Consolidation and Mass Consolidation centres. The obtains 33 per cent of its electricity from rooftop solar panels, whereas the derives 9 per cent from solar energy.
Further reading and related links: